Service · Sprint build
From decision to production software in a 2-4 week sprint.
Sprint Build turns a scoped decision into live software: web apps, dashboards, internal tools, and client portals with real auth, real integrations, and real analytics. Fixed scope and price agreed before we start; most sprints follow an advisory session that already proved the case.
What’s included
Every engagement ships these.
How the sprint works
Human-led, agent-built, iterating fast.
A Sprint Build runs advise, scope, build, hand over. The project director settles what to build and why it pays before a line of code is written; the agent team then designs, builds, and QA-checks in parallel, which is why a scoped application reaches production in weeks, not quarters. After handover, a Care Plan keeps it improving.
Scoping call and fixed scope
We start with a short audit call to understand the workflow you want to replace and the outcome that matters. We turn that into a fixed scope, a fixed timeline, and a fixed SGD price before any code is written — so there are no surprises mid-sprint.
Design and architecture
The delivery lead and the architecture agent settle the data model, the auth model, the integrations, and the screens. You see the shape of the app early, while it is still cheap to change.
Parallel build with weekly checkpoints
AI agents build the frontend, backend, and integrations in parallel while a QA pass runs against each release. You get a working link at every checkpoint and steer the build as it takes shape, rather than waiting for a big-bang reveal.
QA, deploy, and handover
A final quality pass, deployment to production on Singapore-hosted infrastructure, and a handover of the running app plus source. From here you can extend it with a follow-on sprint or take it in-house.
Who it’s for
A good fit if…
- SMEs and startups that need production software fast — an MVP, an internal tool, or a customer-facing portal — without hiring a full dev team.
- Teams replacing spreadsheets or manual workflows with a real application that enforces the rules the spreadsheet only hoped for.
- Founders who need something real in front of customers or investors in weeks, and who care that it is genuinely built, not just designed.
- Operations leads sitting on a process that works but does not scale, and who want it turned into software before the next growth push.
How we work
Pricing
S$15,000-30,000
per 2-4 week sprint. Fixed scope, fixed timeline, quoted in SGD after a short scoping call. Pilot sprints are available on a success-or-refund basis.
FAQ
Questions we get asked.
How is a 2-4 week timeline realistic for production software?
Because the thinking happens before the sprint, not during it. Scope, architecture, and the KPI are settled up front, and the build itself runs in parallel instead of in a queue - design, engineering, and QA at the same time under one project director. Fixed scope is what keeps the timeline honest.
What counts as one Sprint Build?
One clearly scoped application — a web app, dashboard, internal tool, or client portal — with the auth, integrations, and analytics agreed before we start. If your idea is larger than a single sprint, we break it into a first sprint that ships a usable core, then extend it in follow-on sprints.
Who owns the code and the data?
You do. All intellectual property is assigned to you on delivery, and you receive the full source. Applications are built PDPA-compliant and run on Singapore-hosted infrastructure unless you specify otherwise. There is no lock-in.
What if the result does not hit the mark?
We agree on the KPI and the acceptance criteria before the sprint. Pilot sprints are available on a success-or-refund basis — if we miss the number we agreed on, you don't pay for it. That is only possible because scope is fixed and small enough to be honest about.
Your turn
Start with an audit, not a contract.
We start with a short scoping call, agree on the KPI, and quote a fixed sprint. If we miss the number we agreed on, you don’t pay for it.